My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_1985-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:35:11 PM
Creation date
6/3/2020 9:53:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1993
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_1985-1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />NEL KlClm�= I EBNER Sacr Auburn Blvd., Suite A <br />Sacramento, CA 95821 <br />ENGINEERING AND ENVIRONMENTAL SERVICES Telephone: (916) 485-7222 <br />FAX: (916) 485-8098 <br />27 August 1993 <br />Ms. Tish Briggs <br />San Joaquin County PHS <br />Environmental Health Division <br />San Joaquin Street <br />Stockton CA <br />RE: Pacific Bell Underground Tank Replacement <br />345 North San Joaquin Street, Stockton <br />Dear Ms. Briggs: <br />Please find enclosed four (4) sets of plans for replacing the three existing 25,000 -gallon <br />underground tanks located at the above referenced facility. The plan is to remove the existing <br />tanks and install a new 25,000 -gallon double-wall underground tank with double-wall <br />underground piping. Tank and piping will be monitored using a Veeder-Root TLS -2501 tank <br />monitor system. <br />A contractor has not yet been selected, however we will provide you with all the contractor <br />information and site safety plan as soon as a contractor has been chosen. <br />Approximate start date for the project is September 20, 1993. <br />We will also be installing a temporary 2,000 -gallon aboveground tank for the standby power <br />generators while the underground tanks are being replaced. If you have any comments on this <br />issue please let us and the City of Stockton Public Works Department know. <br />If you have any questions, please contact me. I look forward to working with you on this <br />project. <br />Sincerely, <br />Steven Schamaun <br />Staff Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.