My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_1985-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:35:11 PM
Creation date
6/3/2020 9:53:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1993
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_1985-1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed plan is to Petro-Tite test the tanks, then to <br />remove a portion of the concrete floor, hand -excavate, hand <br />drill into the tank and backfill to a depth of one (1) foot <br />minimum below the tank bottom. Take soil test and analysis <br />for total petroleum hydrocarbons, Benzene, Toluene and <br />Xylene. Soil samples will be taken by James Elder, L.B.M.E. <br />Corp. At least_7950, sampl& from each tank will be obtained. <br />hole. <br />If the tankAis clean, the tank would be emptied, washed and <br />backfilled with a cement/sand grout with 5% bentonite. The <br />cement/sand ratio, would be equal to a two -sack per cubic yard <br />mix. <br />Prior to filling with grout, the tanks will be vapor freed <br />using dry ice. Any sludge and wash water will be barreled and <br />removed by an authorized waste hauler. <br />If the hole is contaminated a clean-up plan will be <br />developed. <br />The existing piping above the floor to the tanks would be <br />removed and the piping under the floor would be filled with <br />grout. <br />If there are any questions, please do not hesitate to <br />contact me. <br />Sincerely, <br />James Elder, P.E. <br />Lic. No. RCE 14600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.