The proposed plan is to Petro-Tite test the tanks, then to <br />remove a portion of the concrete floor, hand -excavate, hand <br />drill into the tank and backfill to a depth of one (1) foot <br />minimum below the tank bottom. Take soil test and analysis <br />for total petroleum hydrocarbons, Benzene, Toluene and <br />Xylene. Soil samples will be taken by James Elder, L.B.M.E. <br />Corp. At least_7950, sampl& from each tank will be obtained. <br />hole. <br />If the tankAis clean, the tank would be emptied, washed and <br />backfilled with a cement/sand grout with 5% bentonite. The <br />cement/sand ratio, would be equal to a two -sack per cubic yard <br />mix. <br />Prior to filling with grout, the tanks will be vapor freed <br />using dry ice. Any sludge and wash water will be barreled and <br />removed by an authorized waste hauler. <br />If the hole is contaminated a clean-up plan will be <br />developed. <br />The existing piping above the floor to the tanks would be <br />removed and the piping under the floor would be filled with <br />grout. <br />If there are any questions, please do not hesitate to <br />contact me. <br />Sincerely, <br />James Elder, P.E. <br />Lic. No. RCE 14600 <br />