My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:21:17 PM
Creation date
6/3/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TPa11S1111ttal RECEIVED <br /> Stantec Architecture Inc. <br /> 1383 North McDowell Boulevard; Suite 250 JUN 2 6 2012 <br /> Petaluma CA 94954 <br /> Tel:(707)765-1660 <br /> Fax:(707)765-9908 VI Til HEALTH <br /> Stantec <br /> To: Jeffrey Wong From: Chris Brown <br /> Company: Environmental Health ❑ For Your Information <br /> Department-San Joaquin p For Your Approval <br /> County p For Your Review <br /> Address: 600 East Main Street p As Requested <br /> Stockton, CA 95202 <br /> Phone: (209)468-0335 <br /> Date: June 25, 2012 <br /> File: 2007882005 <br /> Delivery: Fedex <br /> Reference: ATT Facility(UE042); 345 N San Joaquin Street, Stockton, CA— Fuel <br /> Piping and Monitoring System Upgrades <br /> Attachment: <br /> Copies Doc Date Pages Description <br /> 3 06-22-12 21 Half-size fuel system upgrades drawings <br /> 3 06-22-12 6 Completed service request form <br /> 3 06-21-12 2 Letter Work Plan (Shaw Environmental) <br /> 3 06-22-12 5 Completed UST piping repair/retrofit <br /> application <br /> 3 06-22-12 1 Completed tank fees form <br /> 3 06-22-12 15 Equipment cut sheets <br /> 3 06-22-12 11 Contractor license, insurance, certifications <br /> 1 06-22-12 1 Check in the amount of$366.00 <br /> Jeff, <br /> Attached are 3 copies each of the above referenced documents for the subject site for <br /> your review and approval and a check for the required fees. Please contact me if you <br /> have questions or require additional information. Thanks. <br /> One Team.Infinite Solutions. <br /> osb v:\2007\active\2007882005\docs\permitting\cupa\06-22-12_att stockton phase 3_cupa submittal_trn.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.