Laserfiche WebLink
UE042 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> 490-54b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAiN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ®4.NO DISPENSERS ❑99.OTHER(Specify): _ <br /> PANEL MANUFACTURER: _a90-s5 MODEL# 490-56. <br /> LEAK SENSOR MANUFACTURER: _49°-s7 MODEL#(S): W� 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ ..YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 490-62 <br /> 490-63 <br /> ❑2.DOUBLE-WALLED <br /> 2.UDC CONSTRUCTION IS 1:11.SiNGLE-WALLED <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE iS MONITORED BY: [11.Li UiD ❑2.PRESSURE [13.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND ViSUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THiS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49x65. <br /> LEAK DETECTION ELDj MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. _ 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitcring/maintenance records are kept for this facility: <br /> ®Alarm logs 49o.68a ®Visual inspection Records 490-6m, ❑Tank integrity testing results 490-65- <br /> ❑SiR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-685 <br /> ®Equipment maintenance and calibration records. 49048h <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their jobs duties. 49o-m9 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY'❑(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69,- <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490469e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49o-6w <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):moh,m69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems m a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact persorr(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTSIADDiTIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> Fill Tube Shut-Off Valve is the Primary Overfill Protection Device on this system,set to 95%of tank capacity. Overfill Alarm is set to 90n/n of tank capacity. <br /> (L2)Fill S (1-3)Middle Sump,(L5)Supply Transition Box,(1-6)Vent Transition Box&(1-7)Pump Pan Sensors(5)-794380208 <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owrter/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plait occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(,$)are responsible for performing the monitoring and equipment maintenance. <br /> NAME Tart Environmental Services 490-72 TiTLE AT&T Authorized Vendor (Contact List available upon request) 490-73 <br /> NAME AT&T Environment Health&Safety 490-74 TITLE Call Center 490-75 <br /> The Designated Operator shallperform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of arry <br /> conditions that need follow-up'action. <br /> XII.OWNF"PERATOR SIGNATURE <br /> CERTIFICATION:I certify that the informatio ovided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490-77 <br /> 5/2/2912 <br /> PTFE N .Tank. n /- ora r :Nap e -nr tive of Owner <br /> APPLICANT NAME(print): 490-7s APPLICANT TITLE: 490-79 <br /> Steven J Hall mamgff,M&S <br /> UPCF UST-D Ray.(11212011(7) <br />