My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:21:17 PM
Creation date
6/3/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shaw Environmental,Inc. <br /> t 4005 Port Chicago Highway <br /> Concord, California 94520-1120 <br /> Phone:925.288.9898 <br /> e Shaw EriVlt'mTwtal,(rc Fax:925.288.0888 <br /> June 21, 2012 Shaw Project No. 145524 <br /> Mr. Jeffrey Wong <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> Stockton, California 95202 <br /> Subject: Letter Work Plan for Planned Diesel Fuel Piping Removal and <br /> P g <br /> Abandonment Activities,AT&T Facility, 555 Pine Street, San <br /> Francisco, California(R1009) <br /> Dear Mr. Wong: <br /> Shaw Environmental, Inc. (Shaw) is pleased to present this letter report work plan <br /> detailing proposed removal and disposal of approximately 1,000 feet of fuel piping <br /> located at the above-mentioned AT&T facility. In additional, approximately 120 feet of <br /> piping located within an inaccessible piping chase is to be abandoned in place. The <br /> piping is used to provide diesel fuel from a 25,000-gallon underground storage tank <br /> (UST)located in the sidewalk to the north of the AT&T building to two standby <br /> generators with base tanks located on the roof of the AT&T building. <br /> As part of a piping upgrade project,new piping is to be installed with the old fuel piping <br /> then removed. The following sections of this work plan detail the proposed piping <br /> removal activities. <br /> Fuel Piping Removal and Abandonment <br /> The fuel piping leading from the UST enters into the basement of the building and runs <br /> along the ceiling to a piping chase leading to the roof of the building and then to the two <br /> standby generators. Following installation of new fuel piping, the piping located within <br /> the basement and on the rooftop is to be removed, with the piping located within the <br /> inaccessible piping chase to be abandoned in place. <br /> Prior to removal/abandonment, diesel fuel within the supply and return piping will be <br /> drained back into the UST. In order to remove diesel fuel in sections of piping where the <br /> fuel cannot be gravity-drained back into the tank,the fuel will be removed using an <br /> explosion-proof drum vacuum and transferred into a 55-gallon drum. The piping will <br /> then be rinsed to remove residual diesel fuel using a hot pressure washer and detergent, <br />
The URL can be used to link to this page
Your browser does not support the video tag.