My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Automatic Tank Calibration <br />This feature reduces the possibility that an inaccurate tank chart would be the source of errors <br />in inventory reconciliation. <br />• During setup you can program into the EMC the tank chart in 1, 4, or 20 points, tank volume <br />and tank diameter. <br />• When a customer dispenses fuel, the EMC compares the drop in the tank fuel height, the <br />metered volume data, and the tank data programmed at setup to analyze discrepancies. <br />• The EMC revises the chart when discrepancies are identified. <br />• Over time, the chart becomes more and more accurate. <br />• You can acquire an updated tank chart from the EMC using a PC and an RS232 interface. <br />The chart will show volumes at 1" increments throughout the height of the tank. <br />Adjusted Delivery Report <br />When you receive a bulk delivery to a tank. the EMC can measure the amount of fuel dispensed <br />during the delivery using the dispenser interface module. The EMC then provides a report <br />showing: <br />• Actual and temperature compensated fuel increase amounts <br />• Actual and temperature compensated fuel delivery amounts <br />• Amount of fuel dispensed during the delivery <br />You can compare this report to the delivery ticket and invoice to verify the fuel delivery amount <br />is the same. <br />Manual Adjustment <br />The Manual Adjustment feature permits accurate reconciliation for activities that could cause <br />variances. Fuel dispensed during meter testing will be recorded as metered sales, however <br />small amounts returned to the tank after the test may not trigger a delivery report. Manual <br />Adjustment lets you keep your inventory accurate. <br />Programmable Reconciliation Report Times <br />You can program the EMC to provide Inventory Reconciliation reports at the end of each of <br />three shifts, daily or periodically to cover up to a 35 -day period. <br />Pressurized Line Leak Detection (PLLD) <br />This technology provides an accurate 0.1 gph precision and 3.0 gph test for underground <br />fiberglass lines at full pump pressure. <br />PLLD lowers line leak detection installation costs and eliminates yearly precision line leak <br />testing. For existing site retrofit, PLLD's pump port check valve installs into the mechanical leak <br />detector port without a need to connect to or break existing piping. New site installation can be <br />made in-line, and less expensive, using PLLD in the pump output port. PLLD's .01 gph software <br />option eliminates yearly precision line leak testing by an outside agency. <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.