Laserfiche WebLink
Tank Removal Work Plan <br />• <br />Manteca14 r+ • <br />1001 E. YosemiteBlvd, Manteca, <br />Tank Removal: The tank removal operation will last 1-2 days and will <br />include a 3 person crew. Three Tanks and associated piping <br />will be removed from this site as follows; <br />3-10,000 Gallon Gasoline UST's <br />Contact` prior to start 1 c• outline! <br />white paint as requiredby <br />- All fuel in • 1 be pumped • • 1 barrels prior to <br />Tripleremoval, and arranged for disposal by owner Mr. Yhorafani. <br />rinse. • a by f 1 • <br />ty Health <br />Department by HEI. <br />- Saw cut and remove any concretefasphalt as needed for <br />exposure 1 tank. <br />Using a backhoe, approximately' feet of coversoil will • ' <br />removed and set in the <br />supply, return piping and the top of the tank. The piping will <br />then be disconnected from the tank, this piping will be <br />disposed of as a non -hazardous material by HEI. <br />- After piping is removed the backhoe will dig to an elevation <br />at the base of the tank on one side and one end. The spoils <br />will be placed as designated. If is deemed contaminated 10 <br />mil <br />1 plastic tank will '..1 i • 1 inert by placing i lbs•: dry icer1 <br />tank. <br />- A Gasboy Model #205 LEL/02 meter will be used to determine <br />Lower Explosive Limit 1 • oxygenlevelsprior1 <br />the <br />1 being removed from the ground by <br />- Using existing pick lugs, crane rigging will be attached. The <br />tank will be removed and set on the ground adjacent to the <br />excavation. The tank will be blocked to ensure its stability. <br />The County Health Inspector will then inspect the tank for <br />ible evidence of leakage. The tank will thenbe •' • <br />any possi The tank will <br />be <br />• • on to the truck and <br />prior to shipment. <br />delivered to designated by HEI. <br />Page 1 of <br />