Laserfiche WebLink
n <br />ft KEY PERSONAL AND SAFETY RESPONSIBILITIES <br />Responsibilities will be assigned and appropriated authority will be <br />established for the enforcement and compliance with the safety policies and <br />procedures with in this plan. <br />I..15ra WHIN 51 'F! 0 DIN 01 DR1,1111111 P1111 <br />The project Superintendent reports to the Project manager. He is in charge of <br />hazardous waste packaging and handling activities and equipment handling. <br />He is responsible for integrating hazard recognition and control in all work <br />activities, and is immediately responsible for enforcing the Health and Safety <br />Plan. <br />ff,-7ffp,♦ <br />The site manager reports to the Superintendent, as in this case the same <br />individual fills both positions. He is responsible for making sure that all <br />activities and services are completed and provided in a safe manner, <br />according to the contract and county regulations. In addition, he is <br />responsible for the preparation of the manifest for all hazardous materials <br />packaged on the site. <br />All personal are required to have completed the 40 hour OSHA Hazardous <br />Waste Safety Training before arriving on site. Copies of Certificates for each <br />worker shall be available. The training will fulfill all requirement set fourth <br />in the California State Department of Labor and Industry Standards and <br />Federal OSHA standards for construction and general industries, including <br />all applicable hazardous waste regulations. <br />r- ..r♦ - -;. . . . ♦ ♦ - <br />set herein. <br />