Laserfiche WebLink
D PROGRAM CONSOLIDATED FORMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54 <br /> 490.546b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS [199.OTHER(Specify): <br /> PANEL MANUFACTURER: avti ss MODEL#_– –— -- 490-56. <br /> LEAK SENSOR MANUFACTURER: 49°57 MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a.YES ❑b.NO 49x62 <br /> 2.UDC CONSTRUCTION IS ❑1.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 4940-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LIQUID [12.PRESSURE [13,VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 4940-"b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETEC-n N D MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) .......... <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS 490-66 <br /> ---------- <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ❑Alarm logs 49o-68a ❑Visual Inspection Records 490-686 ❑Tank integrity testing results 49o-68c <br /> ❑SIR testing results(and supporting documentation records). 490.68d ❑ Tank gauging results(and supporting documentation records). 490-6se <br /> ❑ATG Testing results(and supporting documentation records).490-6sf ❑ Corrosion Protection 60-day logs 49a6sg <br /> ❑Equipment maintenance and calibration records. 490-686 <br /> IX.TRAINING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACII.,ffY(Check all that apply) <br /> ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4%-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M6w M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.497.7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49o-7i <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the dailyhoutine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The£40117 ' s are respons a for per£ the monitoring and equipment maintenance <br /> NAME v! 490.72 TITLE u f ♦ 9 490.73 <br /> NAME 490-74 TITLE L 0-940 7s <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the omfw/opbrator,and inflim the dwrier/opq6tor of any <br /> conditions that need follow-up action. <br /> XIL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify flp the inforrnatiojprovidedis true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE VA0VIOUVU 0-90-76 DATE: Jaw f90.77 <br /> REPRFS G. 1 Tmk ed 3.Authonmd ft esmtative of Owner <br /> APPLICANT AME(print): c 490-78 APPLICANT TITLE: ` 9°79 <br /> n o_ <br /> UPCF UST-D(12/2007)3/4 ,r <br />