My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:39:52 AM
Creation date
6/3/2020 9:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDE11GROUND STORAGE TANK *STEM <br /> DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING RECORD <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23, Div. 3, Ch. 16 California Code of Regulations (CCR) <br /> Facility Name: SON _[�GIL <br /> Facility Site Address: /00I ,C City: 1*14-.-y 7-rG.-9. <br /> Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br /> provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br /> underground storage tank (UST) systems_ This training must be provided by July 1, 2005, and every 12 months thereafter. <br /> For facility employees hired after July 1, 2005, the initial training must be provided within 30 days of the date of hire. At <br /> least one of the facility employees present during operating hours must have current training.This training must include, but <br /> is not limited to,the following items as specified in 23 CCR Sections 2715(f)(1)and(2): <br /> Operation of the UST system in a manner consistent with the facility's Best Management Practices; <br /> The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br /> The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br /> Name(s)of contact person(s�for emergencies and monitoring equipment alarms; <br /> For facilities that are not routinely staffed,facility employee responsibilities as specified in the training program <br /> approved by the local UST regulatory agency. <br /> 23 CCR§ 2715(f)(3)requires that a list of employees who have been trained by the Designated Underground Storage Tank <br /> Operator(s)be maintained on-site,or off-site at a readily-available location if approved by the local agency, and provided to <br /> the local agency upon request. Completion of this form will satisfy UST training record keeping requirements.The following <br /> employees have been trained as required by 23 CCR Sections 2715(f)(1)and(2): <br /> Facility Employee Name Training Date Hire Date' Trainer Namez <br /> 10AA)9ZR. 5M!a/-/5 lz�X <br /> R J 2-,,2-0 � <br /> m4N r 51rVeW 2• ^l �` <br /> biu,w G <br /> p 13bOLP-r4(4 WAN 644Zru,4we <br /> 'If hired after July 1,2005- <br /> 2 <br /> Trainer must be a current Designated UST Operator for the facility at the time of training. <br /> UN-061 www.unidocs.org 7/13/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.