Laserfiche WebLink
NEW USMSINSTALLATION INSPECTION RE20RD <br />NAlIE:A"_ a J ArAu T ADDRESS: <br />39 TAM ''7 a ULS TANK MODEL/MATMAL: / 1 <br />R.E.H.S: <br />INITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />P <br />M <br />ALL TANKS TO BE INSTALLED AID TESTED IN ACCORDANCE <br />4. PRIMARY TANK TEST: PSI: HRS/MIM: <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />R <br />T <br />0 <br />I <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AID YATERTIGHT) (CCR 2631 (D) (5)) <br />V <br />A <br />19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />E <br />L <br />D <br />S <br />22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />tAX6-PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIM) O LT 130 (CCR 2635 (B) (4)) <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: NRS/MIN:30 OTHER: (CCR 2635 (A) (4)) <br />++ <br />4. PRIMARY TANK TEST: PSI: HRS/MIM: <br />�•- <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />✓ <br />tAX6-PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIM) O LT 130 (CCR 2635 (B) (4)) <br />_Z <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: NRS/MIN:30 OTHER: (CCR 2635 (A) (4)) <br />++ <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) ` HRS: (CCR 2635 (A)) <br />�•- <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />1. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />FINAL INSPECTION <br />✓ <br />EH23--006 3/92 <br />rkL12. PERFORMANCE TEST FOR •ALL` MONITORING PROBES (CCR 2632 (C) (2)) <br />_Z <br />13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br />rA <br />++ <br />rtft.14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF rls (CCR 2635 (B) (5)) <br />-�- --- <br />BALL FLOAT VALVES INSTALLED/J e C" �( 2635 (B) (6)) <br />OVERFILL PROTECTION INSTALLED/APPROVED kv v "q?tffi5 (E) (2)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AID YATERTIGHT) (CCR 2631 (D) (5)) <br />19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br />21. `C' FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br />22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br />23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br />EH23--006 3/92 <br />