My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_1987-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:13:15 PM
Creation date
6/3/2020 9:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2006
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_1987-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 4 - <br />S EI BO LD CO RPO RATI O N <br />P.O. BOX 728 • STOCKTON, CA • 95201 • 209-948-2152 <br />San Joaquin Local Health District June 27, 1989 <br />1601 Hazelton <br />Stockton, CA <br />BANK OF STOCKTON CORPORATE HANGER TANK INSTALL <br />The following is a clarification of our tank install permit for the Bank of <br />Stockton corporate hanger: <br />1. The tank fill will be equipped with a 5 gallon spill protection manhole <br />and an overfill check valve built into 4" drop tube. <br />2. Mark Meiggs (Bank of Stockton) and the track operator will be on standby <br />and will stir the tank prior to filling the tank. <br />3. Fiberglass pipe will be used for tine product piping, in conjunction <br />with Comp System pipe containment. <br />t <br />4. Red Jacket detectors will be used. <br />5. Electronic tank level monitor will. be installed. <br />6. The double -tapped bushings used for 4" risers are galvanized steel and <br />wrapped with 10 mill tape and coated with Chevron pipe emulsion coating. <br />7. The tank will be Owen Corning Fiberglass tank compatible with jet fuel. �/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.