My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Insl <br />Equipment Preparation <br />OCT 2 4 2014 <br />To prepare your equipment for sensor installation: <br />1. Turn Off power to the console. r � <br />2. Make sure no liquid is present in the annular space. Do not install the sensor if any liquid is presenYiffthe'�I <br />annular space.Failure to comply will lead to an alarm. <br />i <br />3. An eyelet has been' provided at the end of the sensor for attaching the pull -cord. <br />4. To ensure the sensor will reach the bottom of the annular space, the splice between the leder cable and the <br />sensor must be 1 foot from ,the bottom of the riser pipe (Figure 2). <br />a. First measure the sensor riser pipe from the bottom of the pipe to the top. <br />b. Subtract 1 foot from the riser pipe measurement, <br />c. Measure the distance up the leader cable from its (connection to the sensor; mark the loader cable with' a <br />piece of tape. <br />i <br />Installation of Float Sr vitch <br />To ensure proper, operation of the float switch, it is important that you install a sensor with the correct cable length. <br />This ensures the float switch will rest as close as possible to the bottom of the tank annulus (Figure 2) <br />i <br />Weatherproof 'unction box with <br />1/2 -inch N.P.T. threads (16 Cubic <br />14" min. dia. manhole inch volume minimum) <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.