My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.. in -Tank Gauging / SIR Equip t; ` <br />Check this box If tank g -used only fortnventory control. <br />Check thiA.box if. no tank OW9 or SIR equipment <br />is Installed. <br />This s`ectionrriust be completed Ifin-tank gauging equipment ls•used to perform,1eak detection monitoring. <br />J1 Com late the followtn checklist <br />❑ Yes ❑ o• Has all In wiring been In, petted for proper entry. and termination including testing for grill fault§? <br />D Yes ❑ No* Were all tank gauging probes vtsuaily.insp®ctad for"damage and:restdue buildup? <br />n Vnc n <br />-+•..o .�rr �u rvnamin®se aenctenc►es were or will 6e corrected.. <br />G. Line. Leak De#actors LLD Check this box If LLDs are not Installed. ' . <br />Gam lete the,followin <br />checldistt <br />[I Yes ....0 . No*' <br />.: 0' N/A <br />For equipment start-up or annual equipmill ent: certiflcatian, was'a leak.simulated to verify LLD performance? (Check all <br />that apply) Shu►atad tgak.rate:. ❑ 3 (7 0.1 <br />g.p.h.; g,p.t � ❑ 0.2 g.p h; <br />o 'Yes 0 No". <br />: Were all LLD$ confirmed operational and, accurate wtthin•regulatory r®qu(rements? <br />p Yes• ❑ ; No, <br />Was the testing.apparatus prpperly calftNated?' . <br />❑ Yes. ' ' ❑ No* <br />. For:meghantoal LLgs, does the LLD restrict product flow.if it.deteets leak?., <br />:t7' N/A' <br />a <br />0 Yes' . 0• . No' <br />❑ N/A . <br />. <br />'For: electronlc LLDs, does the turbine:automaticaliy shut off tfthe. LLD detects a leak? .. <br />❑• Yes ❑. No* <br />❑ N/A <br />For electronic LL s, does the turbine a IItomatloaily'ill hut orf ff.any portion of the'monitoring system is dtsabled'or <br />disconnected? <br />. <br />q Yes ❑ No <br />0 NA <br />'For electronic LLDs,•does•the .turbtne automatically shut off if any porti <br />falls a test? on of the monitoring system malfunctions or <br />p 'Yes Q No" <br />For a ectronic LLDs; have all accessible wiring connections'been visuaily.lnspected? <br />q'. Yes' ❑ -No* <br />Were till Items on the equipment manufacturer' amaintenance•cheokilstcompieted? <br />* In.the. Section ",below, <br />describe how and when •these deficiencies were or wiil'be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.