Laserfiche WebLink
SWRCB, January 2002 Page of <br />9. <br />SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped W'jt�_§p LII/Overffll Containment Boxes 0 <br />Facility <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />erfll C <br />Test Developed By: <br />11 Spill Bucket Manufacturer U Industry Standard 0 Professional Engineer <br />0 Other (Specify) ........ . . <br />Test Method Used: <br />0 Pressure U Vacuum n Hydrostatic <br />1] Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />NEENZE= IMINEEM <br />SEEM!MEMO= <br />---- <br />Spill Box # I Spill Box H Spill Box # Spill Box <br />Bucket Diameter: <br />Bucket Depth: <br />-.1-2" <br />18" <br />Wait time between applying <br />pressure/vacuum/water and <br />5 Min <br />startlllP test: <br />Test Start Time: <br />10:00 <br />Initial Reading (R j): <br />.00 <br />Test End Time: <br />10:30 <br />Final Reading (RF): <br />.00 <br />,Fest Duration: <br />30 min <br />Change in Reading (RF -R,): <br />.00 <br />Pass/Fail Threshold or <br />min <br />Criteria: <br />.005/30 <br />Test Result: <br />x Pass 0 Fail 0 pass O Fail I Pass t a Fail D Pass 0 Fail <br />Comments — (include information on repairs made prior to tasting, and recommended follow-upfor failed tests) <br />