My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />9. <br />SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped W'jt�_§p LII/Overffll Containment Boxes 0 <br />Facility <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />erfll C <br />Test Developed By: <br />11 Spill Bucket Manufacturer U Industry Standard 0 Professional Engineer <br />0 Other (Specify) ........ . . <br />Test Method Used: <br />0 Pressure U Vacuum n Hydrostatic <br />1] Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />NEENZE= IMINEEM <br />SEEM!MEMO= <br />---- <br />Spill Box # I Spill Box H Spill Box # Spill Box <br />Bucket Diameter: <br />Bucket Depth: <br />-.1-2" <br />18" <br />Wait time between applying <br />pressure/vacuum/water and <br />5 Min <br />startlllP test: <br />Test Start Time: <br />10:00 <br />Initial Reading (R j): <br />.00 <br />Test End Time: <br />10:30 <br />Final Reading (RF): <br />.00 <br />,Fest Duration: <br />30 min <br />Change in Reading (RF -R,): <br />.00 <br />Pass/Fail Threshold or <br />min <br />Criteria: <br />.005/30 <br />Test Result: <br />x Pass 0 Fail 0 pass O Fail I Pass t a Fail D Pass 0 Fail <br />Comments — (include information on repairs made prior to tasting, and recommended follow-upfor failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.