Laserfiche WebLink
SWRC8-Jantlaty 2002 <br /> Page 3 of 7 <br /> Job: 4011k of stocitton <br /> 1941 E.Lockheed Ct <br /> Stockton;CA <br /> Date: Ally 1,2009 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer [Xj IndusEngineer fty Standard )Professional <br /> Other(Specify) <br /> Test Method Used: (X)Pressure Vacuum ]Hydrostatic <br /> Other(Specify) <br /> Test Equiptent Used:Pressure Gnu <br /> Piping Run Piping Run 0;1_ping Run Piping Run Piping Run <br /> VENT Run <br /> Piin Material- Fiberglass <br /> Piping Manufacturer: A.O.Smith <br /> pi n Diameter: 2&3 Inch <br /> Length of Piping iG_n. _ 100 feet <br /> Product Stored: N/A <br /> Method and location of <br /> _2jjins-run isolatiori: Test Boot <br /> Wait time between applying <br /> pressitte/vacutim/watet and -0- <br /> starting test: <br /> Test Start Time: 1c00 <br /> Initial Reading <br /> Test End Time: 2:00 pm <br /> Final Reading(LU): <br /> Test Duration: I Hour <br /> Change in Reading(Rf-Rl) -0, <br /> Pass/Fall Threshold or <br /> Criteria: <br /> Test ll ult: [XITM8_1 I PW ...H. Pa59 I-Faik I I Pam I Fail I I Piwj I Fail _Ij <br /> Comments—(iticlade information on repairs made prior to testing,and recommended follow-up for failed tests) <br />