My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DD <br /> JUL 13 2009 <br /> ENVIRONIIMENT HEALTH <br /> ESTABLIAMtY SERMES <br /> BANK OF STOCKTON <br /> COMMERCIAL • CONSUMER • SAVINGS • TRUST <br /> P.O. BOX 1 1 10 • STOCKTON, CALIFORNIA 95201 <br /> July 8, 2009 <br /> Mr. Muniappa Naidu R.E.H.S <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, CA 95202 <br /> RE: Secondary Containment, Test Results - Return to compliance <br /> Dear Mr. Naidu: <br /> Enclosed you find the results of our secondary containment, three year test. This was <br /> conducted on June 17, 2009. <br /> The fuel vent line secondary containment test failed. We obtained the necessary permit, <br /> repairs were made and the system retested under you watchful eye on July 1, 2009. <br /> The second set of successful results is also enclosed. If any thing else is needed. <br /> Please let men know. <br /> ETha you for y ur assistan <br /> V ruly your <br /> an L White <br /> V.P. Chief Pilot <br /> Encl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.