Laserfiche WebLink
1 1 <br /> SWRCB. January 2002 <br /> Page 3 of 7 <br /> Job: Bank of Stockton <br /> 1941 E.Lockheed Ct <br /> Stockton,CA <br /> Date: July 1,2009 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ J Piping Manufacturer [X] Industry Standard [ ]Professional <br /> Engineer <br /> [ ] Other(Specify) <br /> Test Method Used: [X]Pressure [ ]Vacuum [ ]Hydrostatic <br /> [ ] Other(Spec) <br /> Test Equipment Used:Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run Piping Run Piping Run Piping Run Piping Run <br /> VENT <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: A.O.Smith <br /> Piping Diameter: 2&3 inch <br /> Length of Piping Run: 100 feet <br /> Product Stored: N/A <br /> Method and location of <br /> piping-run isolation: Test Boot <br /> Wait time between applying <br /> pressure/vacuum/water and -0- <br /> starting test: <br /> Test Start Time: 1:00 prn <br /> Initial Reading(Rl) 3 psi <br /> Test End Time: 2:00 pru <br /> Final Reading(Rf): 3 psi <br /> Test Duration: 1 Hour <br /> Change in Reading(Rf-Rl) -0- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: [X)Pass,[ ) Fail [) Pass [_ [Fail [ ] Pass [ ) Fail [)Pass))Fail [ ]Pass [ )Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />