Laserfiche WebLink
SWRCB.January 2002 <br /> Page 3 of 7 <br /> Job: Bank of Stockton <br /> 1941 E.Lockheed Ct <br /> Stockton,CA <br /> Date: June 17,2009 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ ] Piping Manufacturer [X] Industry Standard [ ] Professional <br /> Engineer <br /> [ ] Other(Specify) <br /> Test Method Used: [X]Pressure [ ] Vacuum [ ]Hydrostatic <br /> [ ] Other(Spec) <br /> Test Equipment Used:Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run Piping Run Piping Run Piping Run Piping Run <br /> SUCTION RETURN VENT <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: A.O.Smith A.O.Smith A.O.Smith <br /> Piping Diameter: 6"and 4" 4"and 3 2"and 3" <br /> Length of Piping Run: 85 ft. 85 ft. 85 ft. <br /> Product Stored: Jet-A Jet-A <br /> Method and location of <br /> piping-run isolation: Test Boot Test Boot <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:15 am 9:15 am <br /> Initial Reading(R1) 5 psi 5 psi <br /> Test End Time: 10:15 am 10:15 am <br /> Final Reading(Ri): 5 psi 5 psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(Rf=R4) -0- -0- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: [XI Pass[ ] Fail [X] Pass [ ] Fail [ ] Pass [X] Fail []Pass[] Fail ( ]Pass [ ]Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />