Laserfiche WebLink
SWRCB. January 2002 <br /> Page 7 of" <br /> Site; <br /> Date; <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES ' <br /> Facility is Not Equi ped With Spill/Overfill Containment Boxes [ 1 <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested �l <br /> 1 csi\Iethnd Developed [3y: ( I Spill Bucket Manufacturer [X I Industry Standard [ ]Professional L:ngince•�r <br /> Other(5 ect <br /> 'rest Method Used; ( I Pressure ( I Vacuum [x I Hydrostatic <br /> Other(S eci _ <br /> Test E ui ment Used: Caldwell Equipment Resolution: WTI <br /> ALL FILL-TITS I Swill Box Spill Box Silt Box <br /> Bucket Diameter; <br /> Bucket lith: <br /> l Wait time between- <br /> . <br /> etween <br /> apph ink <br /> I press ure'vacuum/water and Wi`?'f i- <br /> s►anin test: <br /> Test Start Time: 211 3119 <br /> I Initial Readin RI If <br /> Test End Time: <br /> Final Reading(RO: <br /> Test Duration: <br /> t:hane,e in Readin Rf-Rt <br /> i Pass/Fail Threshold or <br /> i Criteria: ' <br /> Test Result: Pass I I Fall Pass I j Fall I I Pass IA Pass Fay <br /> Comments—(include information on repairs made prior to testing,and recorttmended follow-up for failed tests) <br /> re <br /> e <br />