Laserfiche WebLink
SWRCB• January 2002 Page 7 of <br /> Site: <br /> Date: <br /> �'e •r <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES'; Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/ON-ertill Containment Boxes are Present, but were Not Tested ( , <br /> t`std Nvcloped By: )Spill Quckc,Manufacturer IX I Industry Standard ( I Professional Ffluiwer <br /> Other(S eei <br /> Test.Method Used: I pressure ( I Vacuum IX l Hydrostatic <br /> Other(S eei ) <br /> Test E ui men[ Used: Caldwell E ui ment Resolution: 1/32" <br /> ALL FILL-TITS -L$Pill Box Spill Box Spill Box <br /> Bucket Diameter: <br /> Bucket De the 1014) Ile <br /> Wait time berween —45 /�'tln/ <br /> applying <br /> pressurt'vacuum/water and w"q-f r <br /> I staving test: <br /> Test Start Time: <br /> I Initial Reading(RI): lyM <br /> Test End Time: <br /> Final Reading(Rf); .� <br /> i Test Duration: <br /> Chang <br /> c in Readin (Rf-RI <br /> I Pass/Fail Threshold or <br /> Criteria: <br /> Test ResuEt; FassI I Fail PassI I Fail Pass Fail Pas <br /> s Fai <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up For failed testa) <br />