Laserfiche WebLink
SWRCB.January 2002 Page 7 of 7 <br /> Site: Bank of Stockton <br /> Airport Hanger <br /> 1941 Lockheed Court <br /> Stockton,CA <br /> Date: November 24,2008 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br /> Test Method Developed By: [ ] Spill Bucket Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> [ ]Other(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br /> ALL FILL-TITS Spill Box Spill Box Spill Box <br /> Bucket Diameter: 12" <br /> Bucket Depth: 20" <br /> Wait time between <br /> applying 5 Minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 8:30 a.m. <br /> Initial Reading(RI): 14" <br /> Test End Time: 9:30 a.m. <br /> Final Reading(Rf): 14" <br /> Test Duration: 1 Hour <br /> Change in.Reading(Rf-R1) -0- <br /> Pass/Fail Threshold or -0- <br /> Criteria: <br /> Test Result: I [X] Pass ' [ ] Fail I I ] Pass ] Fail [ ] Pass [ Fail [ ] Pass [ ] Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> FILL ADAPTER LEAKING. REMOVED, CLEANED AND REINSTALLED. RETESTED. <br />