My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1-Main Sump#2-Transition Sump# Sump# <br /> Sump Diameter: 48" 48"x 48" <br /> Sump Depth: 32" 36" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 17" 12" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" 11" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Line 21" Water Line 16" ` AF <br /> Does turbine shut down when t <br /> sump sensor detects liquid(both Yes Yes <br /> product and water)?* 2 Ll E!. <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes r l i� ,,-,AE eTAL <br /> shutdown? �:,,.�'M �:6IEN <br /> Was fail-safe verified to be <br /> operational?* No No <br /> Wait time between applying water 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 9:37 9:42 <br /> Initial Reading(Ri): .001 .001 <br /> Test End Time: 10:07 10:12 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.