Laserfiche WebLink
a � a <br /> SAN JOAQM COUNTY ENVIRONMZNTAL HEALTH DWARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 M01.1 <br /> TYPE OF ACTION 2.1.NEW PLAN )a CHANGE OF INFORMATION <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. M01 <br /> (Check one item only) 0 THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACELUY EWORMAUON <br /> FACILITY ED#(Agency Use Only) I 1 1 - 1 1 1 1 - 1 1 1 1 1 1 1 <br /> mcnxrymw Bank of Stockton Coporate Hangar #3 M03. <br /> FACILITY SITE ADDRESS 1941 E. Lockheed Ct M04. I CITY Stockton M05. <br /> 11. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,dc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must W performed by qualified personnel. M07. <br /> MONITORING EQUIPMENT IS SERVICED U 1.ANNUALLY 0 99.OTHER(Specify): <br /> H1. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(ie.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> fo Hazardous Materials Business Plan map,atc.)which shows all roquiirod information o ation,include it with this plan. <br /> IV. TANK MONITOWNG <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: M DRY ❑ b.LIQUID FILLED ❑ c,UNDER PRESSURE [] d.UNDER VACUUM M"- <br /> PANEL MANUFACTURER: ex: Root M12. MODEL#: ILS 350 M13. <br /> 4. MODE <br /> LEAK SENSOR MANUFACTURER: U--der Rapt M1MODEL#(S): /Lnq M15. <br /> E] 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16- MODEL MIT <br /> IN-TANK PROBE MANUFACTURER: M'8- MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY 0 c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ c.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.ph. 0 b.0.2 g.ph. 0 c,OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION 0 a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: [I a.36 HOURS ❑ h.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: [] a.ANNUALLY ❑ b.BIENNIALLY 0 c.OTHER(Specify): M26. M27. <br /> ❑ 6.VISUAL MONITORING DONE: [I a.DAILY 0 b.WEEKLY(t¢-o-n-.y approval) <br /> ❑ 99.OTHER(Specify): mn. <br /> V. PIPE MONITOWNG <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> ja 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: Xjj1 a.DRY 0 b.LIQUID FILLED 0 Q UNDER PRESSURE El d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: weeder Root M31, MODEL#: ILS 350 M33. <br /> LEAK SENSOR MANUFACTURER: y Pr Rnnr M34. MODEL#(S): 209 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? 19 a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNEC'ITON OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ]R a.YES ❑ b.NO M37. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (,4LLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s); M"- MODEL#(S): M39. <br /> rl 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: 0 a.MINIMUM MONTHLY 0.2 g.p.h. 0 b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? 0 a.YES 0 b.NO M43. <br /> WELL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? 0 a.YES 0 b.NO M44. <br /> rl 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY 0 b.EVERY 3 YEARS ❑ c,OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: 0 a.DAILY [] b.WEEKLY* ❑ c.MIN.MONTBLY&EACH TIME SYSTEM OPERATED" M47. <br /> *Req-age-y Vp-W **Allowed for mmibx4 ofunbuded emeMmy gawrator fad piping only pw HSC§25281.5(b)(3) <br /> KK6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> 0 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M48. <br /> SJCEHD-d(07/03)-1/4 07t13/03 <br />