My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING"CORD <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited.• Title 23,Div. 3,Ch. 16 California Code of Regulations(CCR) <br /> Facility Name: BANK OF STOCKTON Corporate Hangar #3 <br /> Facility Site Address: 1941 East Lockheed Ct. City: Stockton <br /> Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br /> provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br /> underground storage tank(UST)systems. This training must be provided by July 1,2005,and every 12 months thereafter. <br /> For facility employees hired after July 1, 2005,the initial training must be provided within 30 days of the date of hire. At <br /> least one of the facility employees present during operating hours must have current training.This training must include, but <br /> is not limited to,the following items as specified in 23 CCR Sections 2715(f)(1)and(2): <br /> ❑ Operation of the UST system in a manner consistent with the facility's Best Management Practices; <br /> ❑ The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br /> ❑ The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br /> ❑ Name(s)of contact person(s)for emergencies and monitoring equipment alarms; <br /> ❑ For facilities that are not routinely staffed,facility employee responsibilities as specified in the training program <br /> approved by the local UST regulatory agency. <br /> 23 CCR§2715(f)(3)requires that a list of employees who have been trained by the Designated Underground Storage Tank <br /> Operator(s)be maintained on-site,or off-site at a readily-available location if approved by the local agency,and provided to <br /> the local agency upon request.Completion of this form will satisfy UST training record keeping requirements.The following <br /> employees have been trained as required by 23 CCR Sections 2715(f)(1)and(2): <br /> Facility Employee Name Training Date Hire Date Trainer Name2 <br /> John K. Kluenker 12/28&29/ 6 11/20/0 Norman L. White <br /> (Continued on reverse) <br /> 'If hired after July 1,2005. <br /> 2 Trainer must be a current Designated UST Operator for the facility at the time of training. <br /> UN-061-In www.unidocs.org 07/13/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.