Laserfiche WebLink
A KNOLOG VacuTectTm TEST REPORT <br /> S.O. # 174741 <br /> 7ND <br /> LOGY FOR TANKS <br /> ( IR ENVIRONMENT <br /> Date 05/22/96 <br /> Owner TOSCO NORTHWEST COMPANY Site # 11194 <br /> Phone < 916> 774-2942 <br /> Invoice Name/Address TOSCO NORTHWEST COMPANY 2130 PROFESSIONAL DR . SUITE 100 ROSEVILLE, CA 95661 <br /> Attn: CHESTER BENNETT <br /> Site Name/Address TOSCO NORTHWEST COMPANY B . P . OIL 2375 TRACY BLVD . TRACY , CA 95376 <br /> TANKS LINES Leak Det <br /> Ullage TANKS and LINES Tested to CFR-40 Parts <br /> See Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280-281 &NFPA 329 Specs. <br /> Diag. Dia.& Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LD(s) NEW <br /> For Material Level Level Level Detected Detected Detected ■ Material Syst.Type TEST TEST Rate ■ Pass/ LD(s) <br /> Loc. ST/ ■ ■ ■ ■ ■ ■ Tight ■ ■ ■ ■ ■ Tight Fail/ Tested <br /> FRP/ START START START or ST/ START END or or & Other: <br /> 01 Tank Tank Product Capacity Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPH Fail NONE PASS <br /> Di <br /> 1 PL U S ameter 1A FRP PS 2 1 : 0 7 21 37 0 . 000 T P - Exist LO SN/MDL/MFG 21189-9843 D L D <br /> UN L _ New/2nd LD SN/MDL/MFG: <br /> Material Percent oT Fill at Pump <br /> Start Time: Time of Test: Mfg.: LINE TEST PSI 50 . 00 <br /> lank robe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Ent : De rees: Operate(Yes/no) Y <br /> S U P R Diameter 2A FRP PS 2 1: 4 2 2 2 : 12 0 . 000 T P - Exist LO SN/MDL/MFG: 50790-1303 P L D <br /> UN L I New/2nd LD SN/MOL/MFG: <br /> atenalPercent o lu at ump 50 . 00 <br /> Start Time: Time of Test: Mfg.: LINE TEST PSI <br /> [an k Probe Inclinometer Dispenser shear Valves <br /> End Time: Test PSI: Entry: Decrees: Operate(Yes/no) <br /> 3 REGDiameter 3A FRP PS 2 : 18 22 : 48 0 . 000 T Y r 08 <br /> --r Exist LD SN/MOUMFG: 225-5680 PLD L-�V <br /> U N L P New/2nd LD SN/MDL/M&81795-5019 L+X 1 <br /> Material Percent of Fill at ump <br /> Start Time: Time of Test: Mfg.: LINE TEST PSI 50 . 00 <br /> lank robe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entry- Decrees: Operate(Yes/no <br /> ameter <br /> - Exist LD SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> Material ercent o ill at ump <br /> Start Time: Time of Test: Mfg.: LINE TEST PSI <br /> Tank robe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entrv, Decrees: Operate es/no) <br /> =meter <br /> Exist LD SN/MDL/MFG: <br /> New/2nd LO SN/MOL/MFG: <br /> Material ercent of Fill at —5—Imp <br /> A Start Time: Time Of Test: Mfg.: LINE TEST PSI: <br /> Tank robe Inclinometer Dispenser Shear Valves <br /> End Time: Tet PSI: Ent : Decrees: Operate es/no <br /> Diameter 77— <br /> Exist LO SN/MOL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> -ga—te-ri—aF Percent o I at Pump <br /> Start Time: Time of Test:: Mfg.: LINE TEST PSI: <br /> Tank Probe Inclinometer Dispenser Shear valves <br /> End Time: Test PSI: Ent De r s: O erase(es/no) <br /> Tanknology Corporation International <br /> TANKNOLOGY Region: WESTERN REGION Unit # 015 State Lic. #13 15 State: CA <br /> 5225 Hollister St., Houston,TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. (800) 888-8563 * FAX (713) 690-2255 <br /> TAK-01 <br />