Laserfiche WebLink
12. <br />lil <br />Handling of excavated soil: <br />a) What material will be used to line and cover the tank .& piping stockpile placed on the ground? <br />b) What will be the disposition of the tank & piping stockpile after analysis? <br />.13. What is the depth to groundwater? <br />Describe the source of information: <br />14. Are there any wells on this parcel or adjacent properties? YES [ ] NO [ <br />TYPE OF WELLS <br />I DISTANCE TO TA,-W(S) <br />Public Well <br />Private Well <br />ft. <br />ft. <br />Irrigation Well <br />ft. <br />bfonitoring Well <br />ft. <br />Other <br />ft. <br />15. Will the tank(s) pending closure be replaced with an aboveground or underground storage tank(s) and has the <br />responsible party submitted a "Letter of Commitment" to PHS/EHD? <br />Page 6 <br />closplan (Rev 4/22/91) wp <br />