My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:59:23 PM
Creation date
6/3/2020 9:54:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4Nr. <br />C <br />LICENSE NO. 259820 <br />P.O. BOX 6397 <br />9220 "G" STREET OAKLAND, CA 94603 <br />(415) 562-5511 <br />EXCAVATION <br />1. Prior to excavating, the location • of. underground utilities must be <br />determined and utility owners must be notified. This function <br />will normally be done by the office -but if you are not sure, call <br />the office, especially, if you are to excavate in the street or <br />sidewalk area. <br />2. All excavations 5' or more in depth that are to Ve entered, must <br />be sloped 3/4 to 1 foot or shored*. <br />3.. All excavation must be inspected and monitored for ground movement <br />on a continuing basis. <br />4. There.must be proper• -qualified sup ervIsion•"iLt"alI_',,times d:iiring <br />` excavation.' <br />_-,:5...'..Safety provisions must be taken while installing :and °removing <br />..shoring '-.'the work `can be extremely ;.dangerous: if good practice .is <br />? <br />-ignored <br />Keep spoils well back 2' or more from the edge of all excavations.' <br />:7. Effective barriers and barricades are to be used around all <br />excavations for your protection as well as others that may want to <br />see the work going on. Keep all others not involved in the work <br />well back from the excavations, especially children. <br />8. Watch for overhead power lines, keep at least 10' away from these <br />conductors. <br />9. Trench covers: A facility that is to be kept in operation, as <br />many are, set up barricades and cover trenches to reduce the <br />possibility of a customer driving or walking into an open trench.". <br />When work is done* for the day, insure that you leave the site 'in" a <br />safe condition. <br />C�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.