My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:59:23 PM
Creation date
6/3/2020 9:54:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7jN T <br />TAIT & ASSOCIATES, INC. <br />Consulting Engineers <br />December 31, 1991 <br />San Joaquin County <br />Public Health Services <br />Environmental. Health Division <br />445 No. San Joaquin <br />Stockton, CA 95205 <br />Attn: Bill Snavely <br />Re: BP Oil -"Company <br />2375 Tracy Boulevard <br />(Grant Line Rd @ Tracy Blvd) <br />Tracy, CA <br />• <br />OF <br />Con <br />1 f►e, <br />Subject: Replacement of Dispensers and Piping <br />Dear Mr. Snavely, <br />r & 3 1W <br />n% E rfam 1 V E D <br />JAN 16 1992 <br />ENVIRONMENTAL HEALTH <br />PERMIT/SERVICES <br />As previously discussed with Tish Resch and yourself, BP Oil will <br />be replacing the existing dispensers at this facility. The <br />existing fibertrench and single wall piping will be completely <br />removed from the existing pump islands to the tanks. <br />We will be constructing new pump islands and installing double wall <br />pipe from the new multi -product dispensers to the existing tanks. <br />A containment sump will be installed on the existing tanks, if none <br />exists. <br />The following items, requested by your office, are attached. <br />For Removal: <br />1. Closure application packet <br />2. Closure Plan 8 1/2" x 11" <br />3. EPA notification of hazardous waste <br />4. Contractor soil sampling procedures <br />5. Health and Safety Plan. <br />For Installation: <br />6. 4 sets of full size drawings <br />7. Written fill procedures <br />8. Monitoring Response Plan <br />9. Letter of Commitment <br />10. Cut sheets for new equipment <br />11. Emergency Response Plan (HMMP) <br />Fees: <br />Removal Fee $159.00 (check attached) <br />Installation Fee $159.00 (check attached) <br />activity <br />ln<<%� o dv .r, <br />PALAv%atZ- <br />NvT <br />rau�a � <br />2880 Sunrise Boulevard / Suite 206 / Rancho Cordova, CA 95742 / (916) 635-2444 / FAX: (916) 635-2606 <br />
The URL can be used to link to this page
Your browser does not support the video tag.