My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:59:23 PM
Creation date
6/3/2020 9:54:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tetraethyl lead 0.075 <br />mg /m3 <br />1,2-Dichloroethane 1.0 1.0 2.0 <br />(Ethylene <br />dichloride) <br />Note: *Values specified by ACGIH <br />For purposes of health and safety the strictest <br />established exposure limit shall be used. <br />Physical and chemical hazards must be monitored onsite <br />to ensure that workers are not exposed to hazardous <br />situations. The monitoring which shall be performed <br />during this project is described below. <br />FMIJ PA"!W"W <br />Exposure to excessive heat, noise, and hazardous work <br />conditions shall be monitored throughout the project. <br />All workers entering areas where two people cannot <br />carry -on a normal conversation will be required to wea <br />hearing protection. If heat stress is anticipated due <br />to hot weather or the use of PPE, workers will be <br />monitored by the SSP and will be provided beverages, <br />shaded rest areas, and breaks to prevent heat stress. <br />200 <br />Work area safety inspections will be conducted daily <br />before the start of work and as conditions change by the <br />SSO. Hazardous conditions reported to or observed by <br />the SSO shall be immediately corrected. <br />5.2 E2W _Os u <br />The fire, explosive, and toxic inhalation hazards <br />previously mentioned will be evaluated throughout the <br />project. <br />A direct -reading combustible gas/oxygen meter (CGI) will <br />be used to evaluate the possible formation of flammable <br />atmospheres around the work area. Continuous <br />flammability measurements will be taken at the top of <br />the boring near the work crew throughout well <br />installation. Periodic measurements will be obtained <br />frc;m soil piles, within excavations, and in confined <br />areas where flammable/combustible vapors may accumulate. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.