Laserfiche WebLink
• <br />Responsible parties involved with the installation of the <br />ground water recovery well are: <br />• Mobil Oil Corporation <br />3800 West Alameda Avenue, Suite 700 <br />Burbank, California 91505-4331 <br />Contact: Mr. Steve Pao <br />Environmental Engineer <br />(818) 953-2626 <br />9 Alton Geoscience <br />1000 Burnett Avenue, Suite 140 <br />Concord, California 94520 <br />Contact: Tridib Guha <br />Project Manager <br />(510) 682-1582 <br />or Peter Lange <br />Associate <br />(510) 682-1582 <br />A. General - <br />Site Safety Officer (SSO) - Tridib K. Guha <br />Subcontractor - West Hazmat Drilling Corp. <br />Driller - <br />Driller's helper - <br />B. Site Access Control - <br />Drilling is outside and well ventilated. The <br />prevailing wind direction is southerly. The drilling <br />area will be barricaded at least 10 feet in all <br />directions. The public right-of-way will not be <br />effected. The drilling is onsite. <br />A. Nearest Emergency Medical Facility (Figure 1) <br />Name: Tracy Community Memorial Hospital <br />Address: 1320 North Tracy Boulevard <br />Tracy, California <br />Phone Number: (209) 835-1500 <br />W-4 <br />