My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:59:23 PM
Creation date
6/3/2020 9:54:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION 1B <br /> ARTICLE 3, SECTION 2632 <br /> MONITORING <br /> 1 . Manual and visual monitoring program for motor vehicle fuel tanks only. <br /> -�2Electronic monitors (Article 3, Section 2632(c) (2A,2C)). <br /> WA. Connected to audible/vi.sual alarm(s) <br /> B. Type of detectors: <br /> *41 Brand Name <br /> Model number <br /> Sensor type <br /> a. Vapor <br /> o*b. IiIin <br /> c. Both <br /> ® Sensor specification: <br /> .a. Detection limits <br /> —b. Zero out capabilities <br /> •c. System capable of annual testing <br /> 5� Brochures provided <br /> p,ty Manufacturer"s written installation instructions provided: <br /> SDeCify type of monitoring system (Article 3, Section 2632(d) 1 , 2, 2A, 2B). <br /> Written monitoring plan provided <br /> Written response plan provided <br /> 4. Hard wiring of electronic monitoring system is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.