My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:45:39 PM
Creation date
6/3/2020 9:54:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1998-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UCSB04N—SS#2611194 Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: DUAL 4"PRES GA GES Equipment Resolution: <br /> Piping Run 87 Piping Run 89 ing Run 91 Piping Run <br /> Piping Material: F ASS FIBERGLASS IIBERGrASS <br /> Piping Manufacturer: AMERON AMERON AMERON <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: APPROX. 150' APPROX. 150' APPROX. 150' <br /> Product Stored: 87 89 91 <br /> Method and location of NA NA NA <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 1 HOUR 1 HOUR 1 HOUR <br /> starting test: <br /> Test Start Time: NA 7:30 NA <br /> Initial Reading(RI): NA 5 PSI NA <br /> Test End Time: NA 8:30 NA <br /> Final Reading(RF): NA 5 PSI NA <br /> Test Duration: NA 1 HOUR NA <br /> Change in Reading(RF-Ri): NA 0 NA <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result:' ❑ Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail- D Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> BOTH 87 AND 91 COULD NOT BE TESTED DUE TO BAD SECONDARY TEST BOOTS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.