Laserfiche WebLink
• <br /> Facility: Tracy BP Service Center <br /> D. Results of Testing/Servicing <br /> Software Version Installed:Not Noted <br /> Complete the following checklist: <br /> ®Yes ❑ No* Is the audible alarm operational? ❑Outside Audible Alarm? <br /> ®Yes ❑ No* Is the visual alarm operational? <br /> ®Yes ❑ No* Is the print function operational? ❑Not installed. <br /> ®Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ®Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ® N/A operational? <br /> ®Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ®Sump Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s and operating ro erl ? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑Yes* ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ®Yes ❑ No* Was monitoring stem set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ®Yes I ❑ No* Is all monitoring equipment oerational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: When we tested the 91 Octane fillspill bucket it failed to hold water. It appears that there is a leak <br /> where the flexible bellows attaches to the steel bottom of the bucket. Elite IV was called out to make the repair. The bucket <br /> must be replaced within seven days and a tank precision test performed within seven days after the repair is completed. <br /> Page 2 of 3 03101 <br />