My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UC1194 0 0 Page__3—of—3- <br /> 7. UNDER-DISPENSER CONTAINMENT(UD NG <br /> Test Method Developed By: ❑UDC Manufacturer 0 industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON TS-STS TEST UNIT Equipment Resolution: <br /> MEMO= <br /> t 3/4 UDC#5/6 UDC#7/8 UDC# <br /> UDC Manufacturer: ENVIRON ENVIRON ENVIRON <br /> UDC Material: POLY Poly POLY <br /> UDC Depth: 24" 24" 24" <br /> Height from UDC Bottom to Top 8" 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6" 6" 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to GOOD COOD GOOD <br /> testing: <br /> Portion of UDC Tested 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both YES YES YES <br /> product and water)? <br /> Turbine shutdown response time N/A N/A N/A <br /> Is system programmed for fail- S Yes ❑No DNA 0 Yes ❑No DNA 0Yes 0NoDNA 0Yes DNo0NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes ED No DNA DYes ONo DNA 0Yes 0NoDNA DYes 0No0NA <br /> operational?* <br /> Wait time between applying 15 MIN 15 MIN 15 NUN <br /> press urelvacuum/water and <br /> starting test <br /> Test Start Time: 11:22 11:49 11:22 11:49 11:22 11:49 <br /> Initial Reading(Rj): 4.7094 4.7102 6.0154 6.0145 3.9185 3.9201 <br /> Test End Time: 11:38 12:04 11:38 12:04 11:38 12:04 <br /> Final Reading(RF): 4.7098 4.7092 6.0151 6.0127 3.9181 3.9205 <br /> Test Duration: 15 A41N 15 MIN 15 MIN 15 MIN 15 MIN 15 NUN <br /> Change in Reading(RF-RJ): .0004 .0010 .0003 .0018 .0004 .0004 <br /> Pass/Fail Threshold or Criteria: .002 .002 .002 .002 .002 .002 <br /> Test Result: 10 Pass DFail 0 Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? 0 Yes ❑No [INA 0 Yes ❑No DNA OYes ONoDNA DYes DNo0NA <br /> Was sensor properly replaced and 0 Yes ❑No DNA 0 Yes DNo DNA 0Yes DNo0NA 0Yes 0No0NA <br /> verified functional after testing? I I I I I <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> R&R ALL PIPING PENETRATIONS. FLEXES WIFITTINGS, AND SHEAR <br /> VALVES FOR REPAIRS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.