My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It sysleans <br /> June 6, 2006 <br /> San Joaquin County Department of l","tivironalental 1-lealth <br /> T I - <br /> 3041-'ast Webber Avenue, T` Floor <br /> Stockton, CA. 95202 <br /> Attention: Willy Ng <br /> RE" CONOCO PHILLIPS SS#2611194 <br /> 2375 N. TRACY BLVD <br /> TRACY, CA. <br /> Dear Mr. Ng, <br /> As requested please find below the additional scope of work to be included in the permit for <br /> repair's at the above referenced station. Additional work is required to perform repairs to the <br /> turbine sump. The scope of work is as follows. <br /> ® Saw cut and breakout concrete around the 89-octane turbine sump. <br /> • Fiberglass the external sump to collar connection. <br /> • Cut back primary and secondary line from the turbine sump. <br /> ® Furnish and install two (2) 3,, non-split Eriviron product.-piping penetration. <br /> • Extend primary and secondary lines into turbine sump. <br /> ® Perform required inspections (Pressure test on lines, Hydrostatic on sump). <br /> ® Backfill the 89-octane turbine sump once approval in granted. <br /> • Furnish and install one new traffic grade turbine sump man way. <br /> ® Patch back concrete to match existing grade <br /> ® Perform precision tank test on the 89-octane product tank and product tine and submit <br /> results to San Joaquin County Department of Environmental Health, <br /> ® Return the 89 product back into-operation. <br /> Upon review, please feel free to contact me at (916) 858-1090 or,via ernail at <br /> and I will deliver all additional required information immediately.Thank you <br /> for Your assistance on this matter. <br /> Very Truly Yours, <br /> TAU ENVIRONME.,NTAL SYSTEMS <br /> Jason"ll'. Musial <br /> Project Manager <br /> C A L N,5 8 SO 9 8 Arte L kc, -44'0 9 5 9 8.14 4'.a6 <br /> 6 <br /> r,4,JNh fV1!';, <br /> 0 HU <br /> ZOO[P] IVINEINNONIANH IM TTOTRMT6 YVA TV:60 90OZ/LO/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.