My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s ars <br /> 05 <br /> * Electrical Hazards <br /> 9.3 HAZARD CONTROL MEASURES <br /> 9.3.1 PERSONAL PROTECTIVE EQUIPMENT <br /> * EPA Level D <br /> * EPA Level C (Organic vapor cartridge respirator.) <br /> * Follow instructions in the HASP <br /> 9.3.2 BARRIERS AND SIGNS <br /> Barriers and signs shall be installed around the open excavation. Signs shall state "NO <br /> SMOKING." <br /> FIRE and/or EXPLOSION PREVENTION <br /> Due to the presence of flammable materials and substances on the site, <br /> proper housekeeping practices will be followed. These include storing debris <br /> in a designated location for removal,job-site cleanup at the end of each day, <br /> and storage of hazardous materials according to Tait's existing practices and <br /> procedures. <br /> Tait shall have the appropriate fire extinguisher equipment on the job prior to the start <br /> of the project. No cutting torch, open flame, or spark producing equipment shall be <br /> used on the tank or piping at any time. Any source of ignition shall be at least 50 feet <br /> away from the excavation site. <br /> A properly calibrated flammable/combustible gas and oxygen analyzer is required on <br /> the job site prior to excavation or removal. Calibration of the meter must be within the <br /> last three months. <br /> All electrical lines, piping, and like items known to be associated with the tank shall be <br /> isolated or disconnected. <br /> If at anytime during the excavation, the lower explosive limit of the atmosphere around <br /> the tank exceeds 25 percent, all work will cease and proper mitigation procedures <br /> initiated. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.