My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Owner/Operator/Site Number: ConocoPhillips Co. / HUYENTHANH THI PHANRegion Site # 2611194 RE# 30224 <br />2. Site Address and Phone Number: 2375 TRACY BLVD TRACY, CA 95376 ph. (209) 835-5358 <br />4. Frequency of Monitoring Method and location Where Monitoring will be Performed: <br />Tanks: Tank(s) 0102 03 04 are monitored continuously using an electronic probe in the interstitial space of the tank. <br />Piping: Pipes) 0102 03 have tightness tests performed annually capable of detecting a 0.1 gallon per hour release. Pipe(s) 0102 03 are monitored continuously by a liquid -detecting <br />probe located in the turbine sump. <br />Dispenser: Dispenser pans are equipped with continuous mechanical monitoring/mechanical shut-off device. <br />5. Name(s) and titles) of the persons) responsible for performing the monitoring and/or maintaining the equipment: <br />Operator Name and Number: HUYENTHANH THI PHAN - (209) 835-5358 <br />_ Maintenance: SolvOne - 1-866-215-0965 <br />— — —— — — — <br />6. Reporting Format: ' ————————————————————————---——®——— <br />The monitor will be certified annually and a report generated and provided to the operator. The operator is to report all audible or visual alarm conditions that may indicate a potential release to the <br />ConocoPhillips Field Representative, as well as the responsible party for maintenance listed under #5. In the event of a test failure, the specific piece(s) of equipment are taken out of service and <br />proper reporting procedures followed. The operator is to report all suspected and confirmed releases to the ConocoPhillips Field Representative, as well as the responsible party for maintenance <br />listed under #5. <br />7. State the Preventative Maintenance Schedule for the Monitoring Equipment ®®®®' <br />The electronic monitoring system is certified annually to be functioning per manufacturer instructions by a properly trained and certified third -party contractor. Repairs are made by the responsible <br />party listed under #5 upon notification by the station operator. The station operator is responsible for maintaining copies of testing results and repair records on site and available for agency <br />inspectors. The 3rd -party testing requirements and frequencies for the tank system are summarized below. <br />Contractor UST System Testing RequirementslFrequency <br />Contractor testing of the primary tank is not required. <br />Mechanical leak detector(s) tested annually. <br />The tank secondary containment is tested per manufacturer's specifcations every 3 years in <br />accordance with CCR Title 23 Section 2637. Piping 0102 03 are tested annually. <br />Fuel and vapor spill buckets require annual testing. Secondary containment testing for piping, turbine sumps and dispenser pans is <br />® — — conducted every 3 years per m_an_ufacturer's sLecification_under_CC_R Title_23. <br />— — — — ;"T — — — — — — — — — — — — — — — — — — — — — — — <br />8. Describe thraining Needed for the Operation of Both the Tank System and the Monitoring Equipment: — — — — <br />The operator has been trained to check the tank system and/or monitor daily for proper operation. Training topics include performing daily/monthly inventory reconciliation, inspection of the <br />monitoring system to ensure it is operating properly and not in alarm, periodic inspection of under -dispenser for leaks, inspection of fill and vapor spill buckets, inspection of hoses, nozzles, and <br />other ancillary tank system equipment. If the tank system and/or monitor is not functioning correctly, the operator has been instructed to repair the equipment (if appropriate) or contact the <br />responsible party for Maintenance listed under item #5 for repairs. <br />9. SumrrtaryofSiteOperatorRequirements: ———————————————————————————————— <br />For double wall tanks monitored by interstitial probes, the monitoring equipment must be continously operational with probes in place. Report all non -inventory monitoring alarms to the <br />specified maintenance company and keep a record of alarms and repair work performed. All sites are responsible for maintaining daily and monthly inventory reconciliation records and notifying <br />the ConocoPhillips Field Representative and the Regional Environmental Compliance Specialist for inventory variances greater than the regulatory limit. <br />2611194 / 30224 HUYENTHANH THI PHAN, 2375 TRACY BLVD, TRACY, CA 95376 Date Printed: 10/15/2003 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.