Laserfiche WebLink
Juw-20-2008 10 :48 Am GsTrLER—RYAN INC. 925 551 +770 p- 04 <br /> �N0� <br /> Monitoring Certification �N�| 1N�Y <br /> F. In-Tank Gauging/SIR Equipment: X ��this box if tank is used only�in���� <br /> [] �huckthis box |fn*mnk8uug|ngnrSIR equipment |sinstalled, <br /> This, section must hecompleted if in-tank gauging equipment is used to perforin leak detection monitoring. <br /> Complete the following checklist: <br /> -6—ye-1— E I—N o* Has all input Wiring been inspected for proper entry and termination, including testing for girmind faults? <br /> 13 Yes 0 No* Were all tank gauging probes visually inspected for darriage and residue buildup? <br /> 13 Yes 0 No* Was accuracy of system product level readings tested'? <br /> 0 Yes EJ NO Was accuracy of system water level readings tested'? <br /> E11 Yes 0 No* Were all probes reinstalled properly? <br /> C3 Yes n No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these dericiencies were or will be corrected. <br /> G. Line Leak Detectors (0^D.D): 0 Check this box |fL|.Dxare not inxmu||od. <br /> 0 Yes 0 No* For equipment start-up or annual equipment certification, was a lvak simulated to verify U.I) performance? <br /> El N/A (Check all that apply) Simulated leak rate; C1 3 g.p.h.: E3 0.1 g,p.h ; 0 0.2 g.p.h. <br /> 0 Yes 0 No* Were all IA.Ds confirmed operational and accumte within regulatory requirements? <br /> [3 Yes 0 No* Was the testing apparatus properly calibrated? <br /> [3 No* For mechanical L.I-D%,does the LLD restrict product flow il'it detects a leak? <br /> El Yes 0 No* For electronic LL.Ds,does the turbine automatically shut off if the 1.1.13 detects a leak? <br /> r0 No* For electronic LLDs, does the turbine automatically shut offif any portion of the monitoring systern is disabled <br /> —yc I [j N/A or disconnected? <br /> 0 Yes 0 No" For electronic 1.11,13s,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> C1 N/A or fails a test'? <br /> El Yes 0 No* For electronic LLDs,have all accessible wiring connection,,Wen visually inspected? <br /> 0 Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> It. Comments: -b�� ---'------ <br /> Page 3 »y 3 <br />