Laserfiche WebLink
': _`__-___'___-'___ ._..:•. . <br />---------- <br />$xe.�®vs.�m u3 <br />_ y <br />San Joaquin County <br />Environmental Health Department <br />DIRECTOR <br />Linda Turkatte, REHS <br />1868 Eastalto venue <br />Stockton, ali r ia 5205-6232 <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Website: www.sjgov.org1ehd <br />Kasey Foley, REHS <br />Rodney Estrada, REHS <br />Phone: (209) 466-3420 <br />Adrienne Ellsaesser, REHS <br />Fax: (209) 464-0138 <br />December 30, 2014 <br />John Fahy Construction Co. <br />Fahy Construction <br />11 N, Buchannon Circle #2 <br />Pacheco CA 94553 <br />Re: Tracy Valero SR0070822 <br />2375 N. Tracy Blvd <br />Tracy CA 95376 <br />y <br />The San Joaquin County Environmental Healjt`h Department (EHD) has completed the review of <br />the application for a permit to install bravo conversion frames on 4 UDCs, convert the premium <br />underground storage tank to diesel and corivert the midgrade underground storage tank to <br />premium at the above noted address. The permit has been approved with the following <br />conditions: <br />1. Contact the local fire departmjent and the San Joaquin Valley Air Pollution Control <br />District for any applicable pe,fmits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Michelle Henry at (209) 468-345.4 to arrange the following inspection <br />appointments (a 40", hour notice is required for inspection appointments). Please be <br />aware that inspeions for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />Californi Code of Regulations and the Health & Safety Code. If it is determined that <br />a cold art is necessary, a copy of the alarm history shall be printed prior to <br />perf r ing the "cold start" of the Veeder Root system and made available at the time <br />of E inspection. <br />b. Visual inspection of Bravo conversion frames to verify any leaks will drain/flow <br />into the UDC. <br />4. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />