Laserfiche WebLink
GENERALNOTES <br />The references to Fuel Systems Consulting (FSC). <br />1. In the event of discrepancies between the drawings, specifications, or summary <br />scope of work, the scope of work will govern. Notify Fuel Systems Consulting at once <br />Further references to Fuel Systems Consulting will be FSC. <br />2. FSC shall not be responsible or have control or charge over the acts or omissions, <br />construction means, methods, techniques, sequences or procedures, or for the safety <br />precautions & programs of the contractor, subcontractors, or any other persons <br />performing work on the project. <br />3. FSC has not been retained for review, supervision or administration of the contract. <br />Nor the certification of payments. Construction coordinator shall be the owners <br />representative during construction and until final payment is made. The owners <br />representative shall review the project and render necessary decisions for the progress <br />of the work. FSC has NOT been retainded to provide oversight during construction. <br />4. Contractor is responsible to see that work is done in accordance with all current <br />applicable national, state & local codes, ordinances and requirements by governing <br />agencies whether or not said codes, requirements, etc., are specifically shown on <br />drawings and/or called for in specifications. <br />5. The contractor shall protect all existing improvements to remain throughout <br />construction. Contractor shall repair and or replace, at contractors expense, any <br />existing items and facilities to remain that are damaged by the contractors operations, <br />to the satisfaction of the owners representative. <br />6. Unless delivery is by the owner to the job site, contractor shall deliver such <br />equipment, damage free to the job site. <br />7. Prior to excavation, determine and verify location of utility services in all areas to be <br />excavated. <br />8. The contractor shall comply with all pertinent laws, codes, regulations, UBC, <br />governing agencies & manufacturing installation instructions, unless greater <br />requirements are indicated and or are necessary for the safety of the project. <br />9. The contractor shall be responsible for notifying the COPA as required for <br />inspections. <br />10. The contractor shall provide the owners representative with a construction schedule <br />prior to starting work. A qualified job superintendent shall be present during all of the <br />construction and mark any changes to the plans as an asbuilt. The asbuilts are to <br />maintained on a daily basis. <br />11. The contractor is to provide barricades and fences as required to protect the work <br />and provide a safe place for employees and others that have an interest in the work. <br />All other persons are not allowed on the worksite itself and those spaces shall be <br />barricaded and off limits to all other persons unless they have business on the worksite <br />itself. <br />12. The contractor is responsible for overall construction site cleanliness and removal of all <br />contractor/subcontractor refuse and debris and cleaning of the entire work area at the <br />completion of work. <br />13. Unless stated otherwise in the scope of work summary, all other procedures, <br />testing, materials and equipment shown on the plans shall be furnished and installed <br />by the contractor. <br />14. Contractor shall be responsible for repair for damage to the work of other <br />trades caused by his operations. The nature of such repair work must receive the prior <br />approval of the owners representative. <br />15. Construction material, assemblies and procedures are to comply with locally adopted <br />building codes ordinances. When a conflict occurs between such local code and <br />information shown on the plans, consult owner representative for resolution prior to <br />commencing work. <br />161 16. Contractor to notify owners representative if site conditions or dimensions disagree <br />with information shown on the drawings. Consult owner representative for resolution prior to <br />commencing work. <br />ra lk I X14 <br />• <br />PLANINDEX <br />F-1 COVER SHEET, DWG. NO. 14398F-1.4 <br />14398 SCOPE OF WORK <br />F-2 NEW MPDS, DWG. NO. 14398F-2.4 <br />EQUIPMENT LIST FURNISHED BY NWPUMP CO. <br />AG368-14.02 DATED 9/28/14, 3 pages <br />SCOPE OF PROPOSED WORK: <br />i <br />DEPARTMENT <br />REMOVE EXISTING MPD'S AND INSTALL 4 MPD'S + 1 FOR DIESEL (MULTI -PRODUCT <br />DISPENSERS) REUSED EXISTING HANGING HARDWARE AND INSTALL NEW <br />HANGING HARDWARE FOR DIESEL. <br />SEE EQUIPMENT LIST FURNISHED BY NORTHWEST PUMP & EQUIPMENT CO. <br />AG368-14.02 DATED 09/15/14. <br />TECHNICAL PLANS AND SPECIFICATIONS PREPARED BY: <br />FUEL SYSTEMS CONSULTING <br />490 CYPRESS DRIVE <br />RIO VISTA, CA 94571 <br />TEL. 925-698-7022 EMAIL ROBERT.EAGAN101@GM COM <br />[CC/ INTERNATIONAL CODE COUNCIL CERTFIC ES: q <br />UST INSPECTOR, #5234370 -UI expires 05/08/20 t <br />UST CALIFORNIA SYSTEMS OPERATOR, # 5234 - C exp res 04/07/2016 <br />UST INSTALLATION/RETROFITTER, #5234370-U1 expires 5/31/2015 <br />AST INSTALLATION/RETROFITTER, #5234370-U5 expires 5/31/2015 <br />COVER SHEET <br />revisions I by <br />I 05/19/13 IRE <br />J <br />W <br />W_ <br />2 <br />>F— <br />co <br />IY <br />W <br />co <br />Z <br />W <br />0- <br />U) <br />O <br />F— <br />U <br />O <br />W <br />CL <br />F— <br />J <br />W <br />Z <br />0 <br />C. <br />F— <br />W <br />W <br />TZW <br />w <br />O <br />U <br />N <br />s <br />h <br />Ci <br />J Cp <br />O°0M <br />Q <br />rn <br />F-�XX a <br />UZU <br />W co W <br />F— N F— <br />a <br />U <br />U) <br />O <br />w <br />0 <br />W <br />W <br />LU <br />X <br />CL <br />U <br />0 <br />z <br />J <br />N <br />z <br />O <br />U <br />W <br />5 <br />UJ <br />F- <br />07 <br />07 <br />J <br />W <br />LL <br />2 <br />0 <br />U <br />O <br />z <br />D <br />U) <br />z <br />O <br />U <br />W <br />W <br />F- <br />r <br />w <br />D <br />I <br />0 <br />co <br />N <br />rn <br />date 9/28/2014 <br />tea„ R.S.EAGAN <br />14-398 <br />job <br />14398F1.4 <br />-1 <br />