Laserfiche WebLink
- 3 - <br /> other sections rofthe law, but which LIST systems-ar e found to be located within 1000 <br /> feet of a well, will be notified pursuant to section 25289, subdivision (b) and will be <br /> required to conduct testing within 18 months of notification. <br /> ELD means a test method that ascertains the integrity of an UST system. Therefore, <br /> regardless of the UST system type (i.e., singl e-walled, double-walled, or hybrid 3), the <br /> entire UST system (single-walled and double-walled) must be tested to fulfill the <br /> requirement. <br /> What is the process for implementing ELDD? <br /> As described below, several groups are responsible for various aspects of the process <br /> for ELD implementation: <br /> SWRC13. U.ST Program Responsibility: The SWRCB UST Program is responsible for <br /> notifying owners/operators of UST systems within 1,000 feet of a public drinking water <br /> well that they are subject to the requirements of ELD.-[Health & Saf. Code,,..§ 2529.2.4, <br /> subds. (a) and (b) 525292.5, subd. (b); §25289, subd. '(b); Cal. Code RegFs., Title.23, <br /> 2640, subd. (e)] The SWRCB UST Program. is also responsible for considering requests <br /> for reconsideration' from those UST owners/operators who believe their facility is not <br /> subject to LD. [C I al. Code Regs., Title 23, §2640, subd. (e)(2)] (See below for <br /> additional information on requests for reconsideration.) <br /> Owner/Operator Responsibility: Owners/op.erators of UST systems that meet the <br /> criteria for ELD must complete the following steps: <br /> • ELD Program Plan Approval: Have a written program of ELD (testing program <br /> plan) reviewed and approved by the local agency within six (6) months following <br /> notification by the SWRCB UST Program. [Cal. Code Regs., Title 23, § 2644.1, <br /> subd. (a)(3)], <br /> • ELD Test Implementation: Implement the approved program of ELD (testing <br /> program plan) at their facility. <br /> ® For UST systems with a single-walled component, ELD testing <br /> must be performed within 1.8 months following receipt of notification <br /> from the SWRCB UST Program and repeated every 36 months. <br /> [Cal. Code Regs: Title 23, §.,264.4.1, subd. (a)(3)] <br /> • For UST systems without a single-walled component, upon written <br /> request by the SWRCB, one ELD test must be performed within 18 <br /> months from the date of.notification. [See Health & Saf. Code, § <br /> 25289(b).] <br /> 0 ELD Test Notification: Notify the local agency at least 48 hours prior to <br /> conducting the ELD test unless this notification requirement is waived by the <br /> local agency. [1d., § 2644.1,subd. (a)(4)] <br /> 0 ELD Test Result Submittal: Submit the results of the ELD test to the SWRCB <br /> USTProgram and the local agency within 60 days after the test has been <br /> performed. [1d., § 2644.1, subd. (a)(5)] <br /> 3 A hybrid UST system refers to a UST system comprised of both single-walled and double-walled components.Because they <br /> contain a single-walled component,hybrid UST systems that are subject to ELD must be tested within 18 months of notification and <br /> every three years thereafter,unless all regulated single-walled components are upgraded to double-walled.[Cal.Code Regs.,Title <br /> 23,§2644.1,subd.(a)(1)] <br /> California Environmental Protection Agency <br /> co Recycled Paper <br />