My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 1:51:29 PM
Creation date
6/3/2020 9:54:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JULY 2012-OCTOBER 2013
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_JULY 2012-OCTOBER 2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
revisions by <br /> SOIL SAMPLES TO BE;AKEN AT 20 05/06/13 RBE <br /> ERPERM"IREMENTS <br /> r------------------------------- —1 DISPOSAL OF PIPING SHALL BE PROVIDED BY ECI(ECOLOGY CONTROL) <br /> If-_______________ ____=__11I INCLUDING TRANSPORTATION Q <br /> REMOVE(4)2"FRP"UST"VENT LINES INCLUDING I I r I I I I <br /> RISERS AT THE BUILDING I I <br /> BACK TO THE NEW VENT RISER LOCATION AS SHOWN. I(l I I I <br /> Illi ,0„ lill � <br /> I I <br /> INSTALL NEW VENT SUPPORT PER MFG.INSTALLATION LU <br /> INSTRUCTIONS. Q� <br /> VENT RISERS TO BE 2"SCHEDULE 40 GAL.STEEL PIPE WITH <br /> APPROVED CAPS. O O <br /> 'A.G. <br /> (E)VEEDER-ROOT TLS-350 MONITOR PANEL MIN.127__.I <br /> UPGRADE FOR EVR!ISD DISTANCE FROM BUILDING ADJUST TO SITE CONDITIONS. <br /> Z H n <br /> fn wUo> <br /> INSTALL VEEDER-ROOT CANISTERg V <br /> roof ridge line model no.86129D-002 per mfg. } r <br /> installation instructions,in accordance Cn U U <br /> with CSFM and CARB certifications, F M <br /> on the 87 gas tank vent riser. I—N F <br /> CASHIER o <br /> (E)CONCRETE CUR r0V 0 <br /> LL U <br /> (E)UNDERGROUND TANKs ' 0 <br /> 1-12,000 GALLON 87 GASOLINE LU <br /> Barest to building p a N <br /> 1-10,000 GALLON 89 GASOLINE W o <br /> 1-10,000 GALLON 91 GASOLINE <br /> > w <br /> o � <br /> (E)EMERGENCY PUMP SHUT OFF 0 <br /> 0o O / > w <br /> K LL <br /> N V W <br /> Q � a <br /> 0 N U <br /> O V <br /> O O _ <br /> W E <br /> OO O Z Z <br /> J 1. <br /> Z W UJ <br /> UPGRADE(4)(E)MPD'S Q W p o <br /> GILBARCO model no.B85 o 0 <br /> (single hose non blender) O Ro O 0 C2 U) <br /> install flow meter in each o <br /> dispenser,install a pressure d W N <br /> sensor in the unit nearest the co <br /> 87 tank,install the proper hanging <br /> hardware.typical of 4 w <br /> U. <br /> 1212112012 <br /> 1"=10,-0" <br /> a„ R.S.EAGAN <br /> ne"o. 12-354 <br /> ada+� <br /> 12354F2.3 <br /> 2375 N. TRACY BLVD. REMOVE TANK VENT PIPING F_2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.