Laserfiche WebLink
revisions by <br /> SOIL SAMPLES TO BE;AKEN AT 20 05/06/13 RBE <br /> ERPERM"IREMENTS <br /> r------------------------------- —1 DISPOSAL OF PIPING SHALL BE PROVIDED BY ECI(ECOLOGY CONTROL) <br /> If-_______________ ____=__11I INCLUDING TRANSPORTATION Q <br /> REMOVE(4)2"FRP"UST"VENT LINES INCLUDING I I r I I I I <br /> RISERS AT THE BUILDING I I <br /> BACK TO THE NEW VENT RISER LOCATION AS SHOWN. I(l I I I <br /> Illi ,0„ lill � <br /> I I <br /> INSTALL NEW VENT SUPPORT PER MFG.INSTALLATION LU <br /> INSTRUCTIONS. Q� <br /> VENT RISERS TO BE 2"SCHEDULE 40 GAL.STEEL PIPE WITH <br /> APPROVED CAPS. O O <br /> 'A.G. <br /> (E)VEEDER-ROOT TLS-350 MONITOR PANEL MIN.127__.I <br /> UPGRADE FOR EVR!ISD DISTANCE FROM BUILDING ADJUST TO SITE CONDITIONS. <br /> Z H n <br /> fn wUo> <br /> INSTALL VEEDER-ROOT CANISTERg V <br /> roof ridge line model no.86129D-002 per mfg. } r <br /> installation instructions,in accordance Cn U U <br /> with CSFM and CARB certifications, F M <br /> on the 87 gas tank vent riser. I—N F <br /> CASHIER o <br /> (E)CONCRETE CUR r0V 0 <br /> LL U <br /> (E)UNDERGROUND TANKs ' 0 <br /> 1-12,000 GALLON 87 GASOLINE LU <br /> Barest to building p a N <br /> 1-10,000 GALLON 89 GASOLINE W o <br /> 1-10,000 GALLON 91 GASOLINE <br /> > w <br /> o � <br /> (E)EMERGENCY PUMP SHUT OFF 0 <br /> 0o O / > w <br /> K LL <br /> N V W <br /> Q � a <br /> 0 N U <br /> O V <br /> O O _ <br /> W E <br /> OO O Z Z <br /> J 1. <br /> Z W UJ <br /> UPGRADE(4)(E)MPD'S Q W p o <br /> GILBARCO model no.B85 o 0 <br /> (single hose non blender) O Ro O 0 C2 U) <br /> install flow meter in each o <br /> dispenser,install a pressure d W N <br /> sensor in the unit nearest the co <br /> 87 tank,install the proper hanging <br /> hardware.typical of 4 w <br /> U. <br /> 1212112012 <br /> 1"=10,-0" <br /> a„ R.S.EAGAN <br /> ne"o. 12-354 <br /> ada+� <br /> 12354F2.3 <br /> 2375 N. TRACY BLVD. REMOVE TANK VENT PIPING F_2 <br />