Laserfiche WebLink
10. A few changes by redline on sheet A4.1 to your generic bathroom layout due to <br /> _the recent "Emergency Express Terms of the Division of State Architect which <br /> became effective 8/1/2012. <br /> 11. Confirm, do fuel pump card readers meet accessibility standards as defined in <br /> Clip 11 C of the 2010 CA Building Code? If there are also ATM's on site, there <br /> are CHP 11 B requirements. <br /> Energy: <br /> 1. Provide complete Title 24 documentation, I received LTG forms as a sheet of <br /> plans (T24). You had mentioned that a complete ENV/Perf run had been made. <br /> The information I have did not include those as part of the plans or separately. <br /> Those forms are required and determine the levels of required insulation for walls <br /> and roof which are not defined in these plans graphically or by notation. <br /> 2. Prescriptive roofing require cool roof for new roofing except in limited <br /> circumstances. Roof covering is nowhere specified in these plans. Provide <br /> necessary roof covering details in accordance with your method of meeting 2010 <br /> CA Energy Code requirements. Cool roofs must be certified by the CRRC by <br /> number, on the plans if that method is selected. <br /> 3. Provide roof detail for new roofing area that comprehends method and layers of <br /> construction as well as method and level of required insulation. <br /> 4. <br /> Miscellaneous <br /> 1. I had forwarded your contact information to Kasey Foley, the supervisor and <br /> Program Coordinator for the CUPA, San Joaquin Valley Environmental Health <br /> Department. My understanding is that there was an issue with the underground <br /> tanks. You and Kasey should have spoken by now. Issues concerning <br /> underground tanks fall under Kasey's jurisdiction. You had also mentioned an oil <br /> tank (waste or new) that you were working on with Thuy Tran of Environmental <br /> Health. In my discussions with Kasey, she referred to four underground tanks so <br /> there appears to be a bit of a mismatch here. <br /> NOTE: <br /> 1) Secure final approval of plans and documents from the following divisions/agencies prior <br /> to building permit issuance. <br /> • Fire Prevention Division <br /> • Building Deaprtment <br /> • Planning Division <br /> • Engineering Division <br /> • San Joaquin County Health Department (Underground tanks) <br /> • Air Quality Control Board (Waste oil tank disposal) <br />