Laserfiche WebLink
Coaxial or 2 -Point Phase 1 with Balance Phase II Record descriptions of the noted defects and repairs on the Daily Repair tog. -"accessible In the Operations & Maintenance Manual for inspection <br />vapor recovery system. Piece aCheck merit in Record your initials st.the <br />boftem of the form after completing each day's <br />n 'by the Air P09u6on Control District for a period of at least two years. <br />each box where your inspection revealed no inspection. Keep 'ooples of work orders andfor equipment part receipts <br />problems, and an W in each box where.your <br />. <br />�1/ �i/ ✓- +� ✓..+'" a/� <br />L�i1 � tjtpB �jtMltf&4tp` ✓�'� ,/ <br />(Use TRAFFIC COMES and SAFETY VESTS) <br />1112 131415 161718 19 10 11 12 13 1415 16 17 18 19 20 21 22 23 2x4 25 26 27 28 29 30 : <br />TANKAREA <br />9. Vent line PV valve(s) -preserd, yegow sticker, no vapor shadows <br />VML ✓ V <br />'� <br />a. Spill containers -dean and dry <br />+% ✓ ✓` ✓ <br />-� v <br />3. Spill container drains-operalive and closed, chain attached (if appffcableJ <br />k/ v ✓ <br />✓ *-✓ �/ ✓ <br />s. Vapor adapters -tight an riser, dry break poppet is not missWdamaged <br />✓ `�+✓ <br />�/ s/ ✓ ✓ ,/ <br />6. Fill caps -gaskets present and tight, caps not missing broken orkoose <br />,16. Nozzle hold -open latches -present a <br />7. FIN adapters ,attached ttghtty to riser, inside gasket not mkdng or tom <br />`j ✓ ✓ N <br />a. Fill tube (coaxial spring-loaded),present round, spring trot broker, or sagging9. <br />Coaxial gasket -in place, seatingvapors <br />a% ✓ ✓ <br />lo. FIN tube-(2-Poim) present round <br />tl <br />` ✓ / �/ ti/ <br />0 <br />,16. Nozzle hold -open latches -present a <br />_ .. <br />.,17. :.. , . ,. ...: <br />0 <br />