My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 1:51:29 PM
Creation date
6/3/2020 9:54:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JULY 2012-OCTOBER 2013
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_JULY 2012-OCTOBER 2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qui <br /> �' c <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> N; < <br /> .._ '. 600 East Main Street, Stockton, CA 95202-3029 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/e <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> D ` <br /> Facility Address: I Service Request#: <br /> —(; V-� SM) �6A <br /> 4 <br /> Onsite Si echnician's Name: cc Servi a Technician/Installer Exp.Date: Manufacturer Training: ' I <br /> 40) <br /> SERVICE SERVICE <br /> Leak detector <br /> ❑ mechanical ModelSpill bucket F-1 minimum 5 gallon <br /> El ❑ electronic Serial:: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> El line test programmed El Caldwell System El Other <br /> Leak detector <br /> ❑ mechanical ModelSpill bucket El minimum 5 gallon <br /> ElEl [I❑ 1 hour hydrostatic Incon TS-STS <br /> ❑ electronic Serial: <br /> El line test programmed <br /> ❑ Caldwell System ❑ Other <br /> Leak detector <br /> ❑ mechanical ModelSpill bucket ❑ minimum 5 gallon <br /> El : ElEl1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial: <br /> El line test programmed <br /> ❑ Caldwell System ❑ Other <br /> sensor <br /> El El shutdown Model: ElPrimarppiping testing at: <br /> ❑ fail safe Serial#: minutes <br /> ❑ NA <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑ fail safe Serial#: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial #: Note: Please be aware that 20 containment components are required to be tested upon <br /> El NA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% Corrosion protection ' - - <br /> ❑ Overfill prevention (see LG letter 150-1) ❑ Other: see below <br /> r ( wwar <br /> - <br /> ' S <br /> V/ S. <br /> r <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Ins pe Receiv By: Title: / <br /> EHD 23-04 UST SERVICE REQU ST INSPECTION REPORT <br /> Rev 11/17//08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.