My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 12:51:19 PM
Creation date
6/3/2020 9:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Name: Inspection Date: <br /> fL <br /> QIA <br /> Facility Address: <br /> • ._: x •. Manufacturer <br /> _2*51 <br /> I.J / <br /> UTH61 SERVICE <br /> Leak detector <br /> Spillbucket ■ minimum 5 gallon <br /> Model:■ <br /> ■ ■ ■ 1 houri • ■ Incon <br /> b4lectronic Serial 0 Caldwell System 0 Other <br /> ■ - • .•rammed <br /> detector <br /> Spill bucket 0 minimum 5 gallon <br /> ■ mechanical Model: <br /> 0 e[qctronic Serial#: 0 1 hour hydrostatic 0 Incon TS-STS <br /> ■ Caldwell System 0 Other <br /> ■ line tepLogrammed <br /> Leak detector <br /> pill bucket ■ minimum 5 gallon <br /> ■ .: Model: <br /> 0 electronic Serial#: N 0 1 hour hydrostatic 0 Incon TS-STS <br /> ■ Other <br /> ■ - • •• • <br /> sensor Primary piping - • <br /> 0 positive shutdown Model: <br /> si <br /> fail - <br /> ■ • <br /> Serial#: minutes <br /> ■ NA <br /> Secondary containment testing for: <br /> UDC(s) Piping <br /> ■ r • <br /> ■ x <br /> sensor Testing for the above components are next due by: <br /> 0 positive shutdown Model: <br /> ■ fail safe Serial <br /> installation,6 months after,and every 36 months thereafter. <br /> Drop tube with mechanicaloverfill at 95% ►.brawon.;i • • • • •. -. <br /> Drop tube with mechanical overfill at 95% Co rosion protection <br /> Overfill prevention see LG letter 150-1) Other: see below <br /> w <br /> � � + /►� it _ . _ : /� <br /> f - -44Z 11 d [0111 V Ik <br /> EHD in <br />
The URL can be used to link to this page
Your browser does not support the video tag.