My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 12:51:19 PM
Creation date
6/3/2020 9:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> 1W NF <br /> ENGINEERING, INC. <br /> Monday, g August 23, 2010 R! <br /> AUG 2 4 '010 <br /> SAN JOAQUIN COUNTY ENV. HEALTH - CUPA ENVIKUNIVItN I ftALTH <br /> 600 East Main Street PERMIT/SERVICES <br /> Stockton, CA 95202 <br /> Reference: Quik Stop #144 <br /> 7272 West Lane, Stockton, CA 95210 <br /> Subject: Monitoring System Cold-Start Permit Application <br /> Dear Permitting, <br /> This letter is to serve as transmittal cover for the enclosed cold-start permit application. <br /> Quik Stop is upgrading its POS equipment and this upgrade requires a monitoring <br /> system cold-start to ensure proper communication from the monitoring console to the <br /> POS equipment. The alarm history will be printed out and included in the post cold- <br /> start Monitoring System Certification. <br /> This facility had its annual MSC performed August 2, 2010. This partial MSC will not <br /> change the annual date, it is only to re-certify the monitoring system after the cold- <br /> start. <br /> Please see enclosed permit fee $366.00, Walton licenses, certifications, and site <br /> exhibit. <br /> Thank you and please let me know if there is anything I can do or provide to expedite <br /> permit issuance. This project is scheduled for Thursday, September 23, 2010. <br /> Sincerely, <br /> WA TON ENGINEERING, INC. <br /> Ar <br /> Tanya Tho son <br /> (916) 373-1165 <br /> tanya.t@waltonengineering.com <br /> attachments a/s <br />
The URL can be used to link to this page
Your browser does not support the video tag.