Laserfiche WebLink
Op'QUlfy C � • <br />SAN JOAQUIN COUNTY <br />cr a ENVIRONMENTAL HEALTH DEPARTMENT <br />H: ?, 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />C{•., _ �P <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.segov.org/ehd <br />4�hi <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facilit Name: <br />Inspection Date: <br />() �" - y L+ <br />I - - I H <br />Faci y Address: <br />Service Request #: <br />7a --7,� W est an c_ -h,r\ <br />i I6 7aq <br />Onsite Service Technician's Name: <br />ICC Service TechnicianAnstaller Exp. Date: <br />facturer Training: <br />h -� 01 u <br />��5 -I (o <br />rvau , <br />a I - .I 4 - -,do <br />SERVICE <br />i� <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />i� <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />111 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />cA' LC -4 � c.�►< <br />i� <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: �) <br />Rece' By:�CllTitle: <br />( <br />EHD 23-04 / v UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 !! <br />