My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 12:58:25 PM
Creation date
6/3/2020 9:55:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 07 14 03:35p Elite IV Contactors 12094616342 D <br />0 RECEINN: <br />"TROFIT OR RE: F AJR <br />IST SMEM RE NOV 0 7 2014 <br />(Submit mk*mm of 3 seits of plans & applicaffo.ins as orbinals 11A be retained by F -HD) <br />HEALTH <br />1 Site map, endosed? YES NOU ENVIROMVE", <br />D"T <br />2. Submit copies of ICC Service Teclukko ond/tr lnstalWs cerifficate and all in nufacturertrainkV oertiricatesibil' <br />person lnsWhg Or tesdng anY component tW is repaired or replaced- Ensim I a copy of the IS" Health and <br />Plan" Ls avallable on the jobsite as required by Tft 8. <br />3. Detailed descdP*m of work to be completed. List components to be repairaL I i r- replaced and aftach a diagram d <br />to scale shomAng lo�n of repeim andfor replacenumts. if repairing a cornpo leriL describe how Ws will be done. <br />3. <br />aLftg piping, -UDC. s. or offm UST -equipment or pWonWnq tank top upgr,?x a, use the LIST InstMation ApplIC00 <br />pages 4-8 as necess-my for a mnaly plan review): al <br />-7 111 1 Tr- <br />t4JW <br />cs <br />MW I <br />3 <br />M5 <br />n(Aui�r df YA(j/-1 <br />I <br />-&ifmA1f,1W, <br />-7 111 1 Tr- <br />t4JW <br />cs <br />MW I <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.